Know what to verify, what to budget and what to sign off when buying used ceramic tile machinery.

I have a machine in mind

Open the equipment record and carry its reference into a brief for quotation or inspection.

Find your equipment record

I need help matching a machine

Share your tile formats, target output, existing line, destination and shutdown window.

Prepare a sourcing brief

What to confirm at each stage

Follow the KEDA KD3200 example from line fit to site acceptance.

  1. 01

    Define what the line needs

    Before moving forwardAgree the target tile format, output, interfaces and shutdown window before shortlisting.

    Responsibilities and handover
    Your factory
    Share the tile formats and thickness, target good output, available space, power supply, line height, destination and shutdown window.
    CeramBridge
    Record the requirements and separate must-have constraints from items that still need measuring.
    Inspector or site team
    Confirm access, lifting space and the interfaces with the existing line where a site review is needed.

    Record to keep · A sourcing brief with measurable requirements and open questions.

  2. 02

    Verify the specific machine

    Before moving forwardConfirm the unit identity, current site and inspection access before arranging a visit or estimating collection costs.

    Responsibilities and handover
    Your factory
    Check the model, nameplate and supplied configuration against your brief. Identify any missing tooling, controls or accessories.
    CeramBridge
    Request dated photos, equipment identity, known defects and the supply list. Confirm the current address, whether the unit is still at the factory or in storage, when the location was checked and which tests the site can support.
    Inspector or site team
    Check whether the candidate can fit the existing foundation, utilities and transfer points.

    Record to keep · A candidate record with machine identity, scope, condition and unresolved items.

  3. 03

    Inspect and decide what remains at risk

    Before moving forwardAgree the test scope and acceptance criteria. Assign any untested items to a later check before approving the purchase.

    Responsibilities and handover
    Your factory
    Set test criteria with production and maintenance. Confirm who witnesses and signs the record, and whether independent inspection is needed.
    CeramBridge
    Coordinate agreed access and record observations, test conditions, results, known defects and checks that could not be performed.
    Inspector or site team
    The agreed inspector records what was tested. The destination team confirms which checks can be repeated after installation.

    Record to keep · An inspection record with results, test limitations and open actions.

    • Static inspectionCheck identity, visible wear, accessible components and what is present.
    • No-load testObserve the agreed powered movements and record test conditions and any faults.
    • Loaded production trialUse agreed material, tooling and tile format. Measure output and quality against the buyer’s acceptance criteria.
  4. 04

    Compare the full scope before ordering

    Before moving forwardConfirm included costs, exclusions, payment milestones, delivery point and the conditions for releasing the equipment.

    Responsibilities and handover
    Your factory
    Compare offers to the same delivery point and service scope. Ask finance to include buyer-paid costs and confirm the payment milestones.
    CeramBridge
    Coordinate an itemized offer. List equipment, selected extras, service providers and delivery terms. Record agreed inspection, repair and dispatch conditions in writing.
    Inspector or site team
    Estimate destination unloading, rigging, installation and trial costs where those tasks are assigned locally.

    Record to keep · An itemized quotation and a written list of responsibilities, milestones and exclusions.

    Quote scope checklist

    Example cost split for comparison. Confirm actual inclusions and the named delivery point in the written offer.

    Machine
    Base press and confirmed modules
    Included
    Options and repair
    Mold and agreed hose replacement work
    Separately quoted
    Origin work
    Inspection, dismantling, labeling and packing
    Separately quoted
    Transport
    Freight and insurance scope to the named point
    Separately quoted
    Destination work
    Clearance, duties, unloading, installation and trial
    Buyer-arranged
  5. 05

    Release, receive and accept the equipment

    Before moving forwardRelease shipment against the agreed packing and evidence checklist. Close acceptance against the agreed site trial.

    Responsibilities and handover
    Your factory
    Approve the shipment checklist, record shortages or damage on arrival and sign off the agreed site trial.
    CeramBridge
    Coordinate the agreed dismantling, packing and handover records. Track open items against the written scope.
    Inspector or site team
    Prepare unloading, lifting, utilities and operators. Record installation checks and trial results with the buyer.

    Record to keep · Packing and dispatch records, arrival checks and a signed acceptance or open-issues list.

    1. Before dispatchCheck package IDs, packing list, securing method and loading photos. Confirm who releases the shipment.
    2. On arrivalMatch package counts and IDs. Record visible damage or shortages and notify the agreed contact.
    3. After commissioningRun the agreed trial, record results and assign any remaining corrective work before sign-off.
    Tile production module secured to a timber skid

    Match each package to the packing list and check the securing and loading photos before release.

Common questions

Can we arrange an independent inspection?

Request it early. Agree the inspector, access, test conditions, report scope and cost with the supplier before booking.

What can we check if the machine is disconnected?

Confirm identity, visible condition, included parts and accessible interfaces. Request dated operating records if available and agree which functional checks will need to happen later.

Does the equipment price include dismantling or delivery to my factory?

Read the itemized quote for the agreed scope. Confirm the named delivery point and who pays for dismantling, packing, freight, destination handling and site work.

Can installation be included?

Confirm which provider can attend the site, what work is included, who provides lifting and utilities, and who signs off commissioning. Agree the scope in the written quotation.

What if parts are missing on arrival or the trial falls short?

Record the issue against the signed packing list or trial criteria. Use the agreed notice, corrective work and retest process. Confirm responsibilities and remedies in the purchase agreement.

Prepare your procurement brief

Download a brief to review with production, maintenance and finance.