SACMI Flawmaster 1200
2019 · Surface vision systems · CB-VISION-02

Powered, unloaded
Surface inspection · up to 1,200 mm
Recorded location Zibo, Shandong
Site type and location confirmation date To be confirmed
Confirm the current address and inspection access before arranging a visit.
Condition recorded
Observed condition and test scope
Lighting and image capture tested. Automatic rejection not connected.
Unit price
CNY 196,000Machine views & details
Equipment review
Equipment specifications
| Stock reference | CB-VISION-02 |
|---|---|
| Manufacturer | SACMI |
| Model | Flawmaster 1200 |
| Year | 2019 |
| Recorded location | Zibo, Shandong |
| Equipment type | Surface vision systems |
| Key specification | Surface inspection · up to 1,200 mm |
| Operating condition | Powered, unloaded |
| Condition recorded | 2026-10-21 |
Observed condition and test scope
Lighting and image capture tested. Automatic rejection not connected.
Included items and work before commissioning
Cameras and cabinet included. Confirm line interface.
Check fit with your line
- Surface, shade, dimensional or flatness inspection duty
- Tile sizes, belt speed, defect sizes and reject interface
- Software licenses and compatible controls
Checks to agree before purchase
- Trial with known-good tiles and agreed defect samples
- Misses and false rejects under agreed conditions
- Camera, lighting, calibration and license transfer
Included equipment & purchase scope
Cameras and cabinet included. Confirm line interface.
| Item | Quantity | Scope | Purchase check |
|---|---|---|---|
| Main machine assembly | 1 | Included | SACMI Flawmaster 1200 |
| Cameras | 1 set | Included | Check the quantity and configuration against the signed equipment list. |
| Electrical cabinet | 1 set | Included | Check the quantity and configuration against the signed equipment list. |
| Reject mechanism | To confirm | Confirm | Check the quantity and configuration against the signed equipment list. |
| Software license transfer | To confirm | Confirm with licensor | Check the quantity and configuration against the signed equipment list. |
Purchase configuration
Base price covers the listed unit and explicitly included items. Items marked for confirmation are excluded until agreed.
Recommended equipment packages
Choose one purchase option. Packages identify the actual units; line interfaces and acceptance checks must be agreed before ordering.
Combined with this unitSACMI Flawmaster 1200CB-VISION-02

Included accessoriesSensor cable set
Separate purchase totalCNY 515,600
You saveCNY 30,900
Included accessoriesSensor cable setAdditional calibration reference tiles
Separate purchase totalCNY 518,400
You saveCNY 31,300
Packages include equipment and the named accessories. Transport, taxes and on-site commissioning are quoted separately.
Saved package unavailable. Unit-only pricing restored.
Reference exchange rates
System ratesEnter a positive rate between 0.00000001 and 1,000,000,000,000.
For reference only. Your rates change the estimate, not the CNY base price or final quotation.
Delivery & installation
Delivery plan for CB-VISION-02
The packing and transport plan is confirmed after measuring the equipment and reviewing the buyer’s site access.
-
Confirm equipment scope
Supplier
Confirm what ships with this SACMI Flawmaster 1200 and assign any pre-commissioning work. Current scope notes: Cameras and cabinet included. Confirm line interface.
Buyer
Confirm that the listed configuration (Surface inspection · up to 1,200 mm) suits your line. Send your process requirements, available utilities and delivery location.
Handover Signed equipment and exclusions list
-
Inspect and agree the trial
Supplier
Recorded condition: Powered, unloaded. Lighting and image capture tested. Automatic rejection not connected. For optical sorting, agree a test with good tiles and known defect samples. For size or flatness gauges, compare repeat readings against calibrated reference pieces. Record the test speed and limits.
Buyer
Provide the samples, operating conditions and acceptance limits needed for any additional trial. Agree which checks can be completed at the seller’s site.
Handover Inspection record and agreed test scope
-
Approve quotation and transport plan
Supplier
Plan enclosed freight for the frame and protect separately packed optical and control components from shock and moisture.
Buyer
Confirm the destination, access route, unloading equipment and who handles customs clearance and inland delivery.
Handover Approved scope, freight method and delivery terms
-
Prepare and pack the equipment
Supplier
Back up transferable recipes and calibration files. Immobilise or remove camera and lighting assemblies per the agreed plan and cushion them in labelled cases.
Buyer
Review the package dimensions, handling instructions and storage needs. Confirm access and the intended order of installation.
Handover Package-level packing list and loading photos
-
Load, ship and hand over
Supplier
Record package IDs, weights and securing points. Share the dispatch photos, packing list and freight milestones under the agreed terms.
Buyer
Coordinate receiving and lifting. Check package count and visible damage against the packing list before moving items into storage or installation.
Handover Shipping documents and receiving checklist
-
Install and verify at site
Supplier
Supply the agreed assembly records and confirm who handles repairs, start-up and any contracted site support.
Buyer
Confirm lighting and line triggers, recalibrate the system after installation and repeat the agreed sample and reject tests.
Handover Commissioning and acceptance record
Packing & transport preparation
| Package | Preparation | Transport & handling |
|---|---|---|
| Inspection frame and conveyor | Record line height and transfer interfaces. Secure the frame without loading optical supports. | Use enclosed freight with lifting and tie-down points agreed for the measured package. |
| Sensors, lights and controller | Back up transferable recipes and calibration files. Use cushioned, moisture-protected packaging for detached optics. | Keep optical parts upright where required and record any transport locks before packing. |