CeramBridge
Prepare a Brief
← Squaring & Finishing

BMR Levigatrice 1200

2019 · Polishing and lapping · CB-SQUARING-05

BMR Levigatrice 1200 — Front view
Front viewCB-SQUARING-05

Powered, unloaded

Polishing · up to 1,200 mm

Recorded location Foshan, Guangdong

Site type and location confirmation date To be confirmed

Confirm the current address and inspection access before arranging a visit.

Condition recorded

Observed condition and test scope

Head lift and jog tested. Coolant nozzle on head three is blocked.

Unit price

CNY 345,000

Machine views & details

Equipment review

Equipment specifications

Stock referenceCB-SQUARING-05
ManufacturerBMR
ModelLevigatrice 1200
Year2019
Recorded locationFoshan, Guangdong
Equipment typePolishing and lapping
Key specificationPolishing · up to 1,200 mm
Operating conditionPowered, unloaded
Condition recorded2026-10-24

Observed condition and test scope

Head lift and jog tested. Coolant nozzle on head three is blocked.

Included items and work before commissioning

Clean or replace nozzle before wet trial.

Check fit with your line

  • Tile size, thickness and line speed
  • Squareness tolerance, edge finish and chamfer profile
  • Wet operation or dust extraction requirements

Checks to agree before purchase

  • Trial on representative tiles with measured edge quality
  • Spindle play, guides, guards and included consumables

Included equipment & purchase scope

Clean or replace nozzle before wet trial.

ItemQuantityScopePurchase check
Main machine assembly1IncludedBMR Levigatrice 1200
Fitted polishing heads1 setIncludedCheck the quantity and configuration against the signed equipment list.
Coolant nozzle on head threeTo confirmService requiredCheck the quantity and configuration against the signed equipment list.
Polishing abrasivesTo confirmConfirmCheck the quantity and configuration against the signed equipment list.

Purchase configuration

Base price covers the listed unit and explicitly included items. Items marked for confirmation are excluded until agreed.

Recommended equipment packages

Choose one purchase option. Packages identify the actual units; line interfaces and acceptance checks must be agreed before ordering.

Packages include equipment and the named accessories. Transport, taxes and on-site commissioning are quoted separately.

Optional accessories

Reference exchange rates

System rates

For reference only. Your rates change the estimate, not the CNY base price or final quotation.

Delivery & installation

Delivery plan for CB-SQUARING-05

The packing and transport plan is confirmed after measuring the equipment and reviewing the buyer’s site access.

  1. Confirm equipment scope

    Supplier

    Confirm what ships with this BMR Levigatrice 1200 and assign any pre-commissioning work. Current scope notes: Clean or replace nozzle before wet trial.

    Buyer

    Confirm that the listed configuration (Polishing · up to 1,200 mm) suits your line. Send your process requirements, available utilities and delivery location.

    Handover Signed equipment and exclusions list

  2. Inspect and agree the trial

    Supplier

    Recorded condition: Powered, unloaded. Head lift and jog tested. Coolant nozzle on head three is blocked. Agree a trial on the buyer’s tiles and measure the relevant edge finish, squareness, chamfer or cut quality.

    Buyer

    Provide the samples, operating conditions and acceptance limits needed for any additional trial. Agree which checks can be completed at the seller’s site.

    Handover Inspection record and agreed test scope

  3. Approve quotation and transport plan

    Supplier

    Measure conveyor and machine sections after any agreed split. Check enclosed container fit, including loading clearance and the weight of the main bed.

    Buyer

    Confirm the destination, access route, unloading equipment and who handles customs clearance and inland delivery.

    Handover Approved scope, freight method and delivery terms

  4. Prepare and pack the equipment

    Supplier

    Mark bed and conveyor joints, lock moving heads and protect spindle ends and guides. Drain wet circuits where fitted and box detached guards and tooling.

    Buyer

    Review the package dimensions, handling instructions and storage needs. Confirm access and the intended order of installation.

    Handover Package-level packing list and loading photos

  5. Load, ship and hand over

    Supplier

    Record package IDs, weights and securing points. Share the dispatch photos, packing list and freight milestones under the agreed terms.

    Buyer

    Coordinate receiving and lifting. Check package count and visible damage against the packing list before moving items into storage or installation.

    Handover Shipping documents and receiving checklist

  6. Install and verify at site

    Supplier

    Supply the agreed assembly records and confirm who handles repairs, start-up and any contracted site support.

    Buyer

    Prepare levelling points, water or extraction connections as applicable. Align transfers and check the finish and dimensions on the buyer’s tiles.

    Handover Commissioning and acceptance record

Packing & transport preparation

PackagePreparationTransport & handling
Machine bed and transfersRecord levelling and transfer alignment, secure heads and protect guides.Check machine length and agreed split points before selecting container loading.
Tools and service circuitsDrain wet circuits where fitted. Box detached guards, tooling and fittings.Keep abrasive tools, blades and protected spindle surfaces separated from loose heavy items.