CeramBridge
Prepare a Brief
← Kiln Fans & Components

Yilida 4-72 No. 8C

2021 · Exhaust fans · CB-FAN-04

Yilida 4-72 No. 8C — Front view
Front viewCB-FAN-04

Bench-tested

18.5 kW · extraction

Recorded location Gao’an, Jiangxi

Site type and location confirmation date To be confirmed

Confirm the current address and inspection access before arranging a visit.

Condition recorded

Observed condition and test scope

Belt tracking checked for ten minutes. Belt cover latch is loose.

Unit price

CNY 16,800

Machine views & details

Equipment review

Equipment specifications

Stock referenceCB-FAN-04
ManufacturerYilida
Model4-72 No. 8C
Year2021
Recorded locationGao’an, Jiangxi
Equipment typeExhaust fans
Key specification18.5 kW · extraction
Operating conditionBench-tested
Condition recorded2026-10-23

Observed condition and test scope

Belt tracking checked for ten minutes. Belt cover latch is loose.

Included items and work before commissioning

Secure or replace latch before installation.

Check fit with your line

  • Combustion, circulation, cooling or extraction duty
  • Airflow and static pressure at operating temperature
  • Rotation, outlet orientation, flange and motor rating

Checks to agree before purchase

  • Fan and motor nameplates, impeller and housing condition
  • Vibration results and test conditions when available
  • Inclusion of base, coupling, guard and drive

Included equipment & purchase scope

Secure or replace latch before installation.

ItemQuantityScopePurchase check
Main machine assembly1IncludedYilida 4-72 No. 8C
Motor and belt driveTo confirmConfirmCheck the quantity and configuration against the signed equipment list.
Belt guard1 setIncludedCheck the quantity and configuration against the signed equipment list.
Flexible connectorsTo confirmConfirmCheck the quantity and configuration against the signed equipment list.

Purchase configuration

Base price covers the listed unit and explicitly included items. Items marked for confirmation are excluded until agreed.

Recommended equipment packages

Choose one purchase option. Packages identify the actual units; line interfaces and acceptance checks must be agreed before ordering.

Combined with this unitYilida 4-72 No. 8CCB-FAN-04

Ferrari FS-710CB-FAN-01 · 2019Bench-testedView equipment details →

Included accessoriesFlange gasket kit

Separate purchase totalCNY 28,680

You saveCNY 1,680

Included accessoriesFlange gasket kitFlexible connector set

Separate purchase totalCNY 29,880

You saveCNY 1,880

Packages include equipment and the named accessories. Transport, taxes and on-site commissioning are quoted separately.

Optional accessories

Reference exchange rates

System rates

For reference only. Your rates change the estimate, not the CNY base price or final quotation.

Delivery & installation

Delivery plan for CB-FAN-04

The packing and transport plan is confirmed after measuring the equipment and reviewing the buyer’s site access.

  1. Confirm equipment scope

    Supplier

    Confirm what ships with this Yilida 4-72 No. 8C and assign any pre-commissioning work. Current scope notes: Secure or replace latch before installation.

    Buyer

    Confirm that the listed configuration (18.5 kW · extraction) suits your line. Send your process requirements, available utilities and delivery location.

    Handover Signed equipment and exclusions list

  2. Inspect and agree the trial

    Supplier

    Recorded condition: Bench-tested. Belt tracking checked for ten minutes. Belt cover latch is loose. Confirm what a bench check covers and whether rotation, current and vibration can be recorded. Review suitability against the hot operating duty.

    Buyer

    Provide the samples, operating conditions and acceptance limits needed for any additional trial. Agree which checks can be completed at the seller’s site.

    Handover Inspection record and agreed test scope

  3. Approve quotation and transport plan

    Supplier

    Quote a crated fan for enclosed freight when it fits. Check separate skids and handling for an oversized housing or separately shipped motor.

    Buyer

    Confirm the destination, access route, unloading equipment and who handles customs clearance and inland delivery.

    Handover Approved scope, freight method and delivery terms

  4. Prepare and pack the equipment

    Supplier

    Secure the base on a skid, restrain the rotor as appropriate and cover the inlet and outlet flanges. Protect the motor and loose fittings separately as needed.

    Buyer

    Review the package dimensions, handling instructions and storage needs. Confirm access and the intended order of installation.

    Handover Package-level packing list and loading photos

  5. Load, ship and hand over

    Supplier

    Record package IDs, weights and securing points. Share the dispatch photos, packing list and freight milestones under the agreed terms.

    Buyer

    Coordinate receiving and lifting. Check package count and visible damage against the packing list before moving items into storage or installation.

    Handover Shipping documents and receiving checklist

  6. Install and verify at site

    Supplier

    Supply the agreed assembly records and confirm who handles repairs, start-up and any contracted site support.

    Buyer

    Verify flange orientation and motor supply. Agree rotation, vibration and operating duty checks after connection to the existing kiln.

    Handover Commissioning and acceptance record

Packing & transport preparation

PackagePreparationTransport & handling
Fan and baseSecure the base to a skid, protect the shaft and cover inlet and outlet openings.Crate or protect the assembly for enclosed freight if its dimensions and weight permit.
Motor and loose connectionsRecord rotation and flange orientation. Bag and identify detached fittings.Confirm whether the motor stays mounted or travels on a separate skid.