CeramBridge
Prepare a Brief
← Glazing & Decoration

Air Power Group E-PIC 1000

2022 · Spray booths · CB-GLAZING-05

Air Power Group E-PIC 1000 — Front view
Front viewCB-GLAZING-05

Running in line

Glaze application · up to 1,000 mm

Recorded location Foshan, Guangdong

Site type and location confirmation date To be confirmed

Confirm the current address and inspection access before arranging a visit.

Condition recorded

Observed condition and test scope

Observed spray pattern and recirculation under the installed recipe.

Unit price

CNY 148,000

Machine views & details

Equipment review

Equipment specifications

Stock referenceCB-GLAZING-05
ManufacturerAir Power Group
ModelE-PIC 1000
Year2022
Recorded locationFoshan, Guangdong
Equipment typeSpray booths
Key specificationGlaze application · up to 1,000 mm
Operating conditionRunning in line
Condition recorded2026-10-24

Observed condition and test scope

Observed spray pattern and recirculation under the installed recipe.

Included items and work before commissioning

Glaze tank and recovery tray included.

Check fit with your line

  • Glaze application method, tile format and line speed
  • Printer head configuration, ink and service access
  • Transfer heights, controls and utilities

Checks to agree before purchase

  • Nozzle check or sample pattern where feasible
  • Pump, booth and conveyor condition
  • Included software and flushing equipment

Included equipment & purchase scope

Glaze tank and recovery tray included.

ItemQuantityScopePurchase check
Main machine assembly1IncludedAir Power Group E-PIC 1000
Glaze tank1 setIncludedCheck the quantity and configuration against the signed equipment list.
Recovery tray1 setIncludedCheck the quantity and configuration against the signed equipment list.
Pump and connecting pipeworkTo confirmConfirmCheck the quantity and configuration against the signed equipment list.

Purchase configuration

Base price covers the listed unit and explicitly included items. Items marked for confirmation are excluded until agreed.

Recommended equipment packages

Choose one purchase option. Packages identify the actual units; line interfaces and acceptance checks must be agreed before ordering.

Packages include equipment and the named accessories. Transport, taxes and on-site commissioning are quoted separately.

Optional accessories

Reference exchange rates

System rates

For reference only. Your rates change the estimate, not the CNY base price or final quotation.

Delivery & installation

Delivery plan for CB-GLAZING-05

The packing and transport plan is confirmed after measuring the equipment and reviewing the buyer’s site access.

  1. Confirm equipment scope

    Supplier

    Confirm what ships with this Air Power Group E-PIC 1000 and assign any pre-commissioning work. Current scope notes: Glaze tank and recovery tray included.

    Buyer

    Confirm that the listed configuration (Glaze application · up to 1,000 mm) suits your line. Send your process requirements, available utilities and delivery location.

    Handover Signed equipment and exclusions list

  2. Inspect and agree the trial

    Supplier

    Recorded condition: Running in line. Observed spray pattern and recirculation under the installed recipe. For a digital printer, agree a nozzle check and sample pattern. For glaze applicators, agree a check of coating uniformity and line speed.

    Buyer

    Provide the samples, operating conditions and acceptance limits needed for any additional trial. Agree which checks can be completed at the seller’s site.

    Handover Inspection record and agreed test scope

  3. Approve quotation and transport plan

    Supplier

    Check enclosed container fit and any upright or temperature constraints for printer modules. Confirm handling of residual ink or glaze with the carrier.

    Buyer

    Confirm the destination, access route, unloading equipment and who handles customs clearance and inland delivery.

    Handover Approved scope, freight method and delivery terms

  4. Prepare and pack the equipment

    Supplier

    Agree the flush or preservation method for the installed printheads or glaze circuits. Immobilise carriages, seal fluid connections and pack detached electronics with moisture protection.

    Buyer

    Review the package dimensions, handling instructions and storage needs. Confirm access and the intended order of installation.

    Handover Package-level packing list and loading photos

  5. Load, ship and hand over

    Supplier

    Record package IDs, weights and securing points. Share the dispatch photos, packing list and freight milestones under the agreed terms.

    Buyer

    Coordinate receiving and lifting. Check package count and visible damage against the packing list before moving items into storage or installation.

    Handover Shipping documents and receiving checklist

  6. Install and verify at site

    Supplier

    Supply the agreed assembly records and confirm who handles repairs, start-up and any contracted site support.

    Buyer

    Confirm utility connections and transfer heights. Run a nozzle and pattern check or a glaze application trial with the agreed materials.

    Handover Commissioning and acceptance record

Packing & transport preparation

PackagePreparationTransport & handling
Machine and fluid systemAgree the flush or preservation method. Isolate fluid ports, immobilise moving components and protect the conveyor.Confirm upright handling and any fluid or temperature conditions with the carrier.
Controls and service itemsPack electronics against moisture and identify detached pumps, filters, tanks and trays.Measure separate service packages and confirm their place in the loading order.